What it is for
Find out which planning route applies — permission, permitted development (often confirmed with an LDC), or listed building consent.
HBPD · Sample project
Beta — improving with homeowner feedbackHomeowner Build Pathway helps you see what comes next in your home building project in England. Try a sample extension, explore the guidance and checklists, and tell us where you’d like more help. We’ll use feedback from early users to decide what to improve next.
No sign-in needed. Nothing you do on this page is saved or sent anywhere.
Fictional example project
Fictional example household planning a two-storey side extension in England: garage and utility downstairs; bedroom, sitting area and en suite upstairs. Preliminary drawings exist. The planning route is not confirmed. A structural engineer will be needed and more than one contractor may be involved. The household is considering self-management. Dormers versus rooflights is undecided. Demolition and structural openings may be required.
No real people, addresses, companies or documents. In the full app you answer these questions about your own home, and the pathway is tailored to your answers using the same rules.
This sample opens three stages. The full app covers all 20, from your first household idea to completion and handover.
Every statement carries a label: Provided by you Official general guidance Typical practice Needs professional or authority confirmation Unknown — so assumptions are never presented as facts.
Stage 5 of 20 · Design and permissions
Find out which planning route applies — permission, permitted development (often confirmed with an LDC), or listed building consent.
Likely relevant to this project
Find out which planning route applies — permission, permitted development (often confirmed with an LDC), or listed building consent.
Designer has advised on the likely planning route
In practice: Your designer normally prepares and submits any planning or LDC application for you, but the decision belongs to the council. Typical practice
Building without the right planning position can lead to enforcement action and problems when selling.
Most applications are decided within 8 weeks after validation; preparation adds time — project-dependent.
Often runs alongside: stages 6 (Party walls), 7 (Structure and technical design), 8 (Building Regulations). Technical design and Building Regulations work often runs alongside planning, at your risk if the design then changes.
Planning permission, Building Regulations approval and Party Wall matters are separate. You may need any combination of them, and having one does not mean you have the others.
Source: Building regulations approval
Party walls and building work
Planning Portal guidance says householder permitted development does not cover side extensions of more than one storey, and that side extensions on designated land (such as conservation areas) need householder planning permission. Rules for other extensions have detailed limits and conditions.
Who confirms this: Your local planning authority — only they can confirm the planning position for your property.
Source: Extensions — Planning permission (householder permitted development guidance)
Planning Portal guidance says a side extension can only be permitted development if it is a single storey, no more than four metres high and no more than half the width of the original house — and that on designated land all side extensions need householder planning permission. Other limits and conditions also apply.
Who confirms this: Your local planning authority — only they can confirm the planning position for your property.
Source: Extensions — Planning permission (householder permitted development guidance)
Planning Portal guidance says an extension of more than one storey must not extend beyond the rear wall of the original house by more than three metres, or be within seven metres of any boundary opposite the rear wall, to be permitted development. On designated land, rear extensions of more than one storey need householder planning permission. Other limits and conditions also apply.
Who confirms this: Your local planning authority.
Source: Extensions — Planning permission (householder permitted development guidance)
Planning Portal guidance says roof enlargements such as dormers can be permitted development for houses only within limits — including an added volume of no more than 40 cubic metres for terraced houses and 50 cubic metres for other houses, nothing beyond the existing roof slope on the main elevation facing a highway, and not on designated land. Other limits and conditions also apply.
Who confirms this: Your local planning authority.
Source: Loft conversion — Planning permission (householder permitted development guidance)
Planning Portal guidance says the householder permitted development rules for extensions apply to houses only, not to flats or maisonettes.
Who confirms this: Your local planning authority.
Source: Extensions — Planning permission (householder permitted development guidance)
Permitted development rights can be more limited or removed — for example on designated land such as conservation areas, or where the council has made an Article 4 direction.
Who confirms this: Your local planning authority.
Source: Extensions — Planning permission (householder permitted development guidance)
A Lawful Development Certificate for proposed work is optional. It gives formal confirmation that the work as described would be lawful for planning purposes. It is not planning permission and does not replace Building Regulations.
Source: Lawful development certificates (guidance)
Lawful Development Certificate — consent types
GOV.UK says most planning applications are decided within 8 weeks.
Source: Planning permission — After you apply (decision timescales)
Listed building consent is generally needed for demolition, alteration or extension that affects a listed building’s special architectural or historic interest, inside or outside. It is separate from planning permission, and carrying out such work without consent is a criminal offence.
Who confirms this: Your local planning authority’s conservation officer.
Planning Portal guidance says an extension cannot be built forward of the principal elevation of the house — or, where it fronts a highway, the side elevation — under householder permitted development. Porches have their own separate allowance.
Who confirms this: Your local planning authority — only they can confirm the planning position for your property.
Source: Extensions — Planning permission (householder permitted development guidance)
Planning Portal guidance says a porch can be permitted development for a house if its ground floor area (measured externally) is no more than three square metres, no part is more than three metres above ground level, and no part is within two metres of a boundary that fronts a highway. This does not apply to flats or maisonettes, or where a planning condition, Article 4 direction or other restriction removes these rights.
Who confirms this: Your local planning authority.
Source: Porches — Planning permission (householder permitted development guidance)
What HBPD does not do: This app never decides whether your project has permitted development rights or needs permission. Only your local planning authority can confirm that.
Stage 6 of 20 · Design and permissions
Check whether your work affects a shared wall, the boundary, or excavation near neighbours’ foundations, and serve notices in good time.
Likely relevant to this project
Check whether your work affects a shared wall, the boundary, or excavation near neighbours’ foundations, and serve notices in good time.
Identified any notifiable work
In practice: Talking to neighbours before formal notices arrive usually makes the process smoother. Party wall surveyors are often only needed if a neighbour does not consent. Typical practice
Notice periods can delay the start of work if left late. Early, friendly contact with neighbours often helps.
Notice periods of one to two months, plus any award process — project-dependent.
Often runs alongside: stages 5 (Planning route), 7 (Structure and technical design), 8 (Building Regulations).
The Party Wall etc. Act 1996 covers work to an existing party wall or structure, building a new wall on or at the boundary, and some excavation near a neighbour’s building. Wooden fences are not party walls.
Who confirms this: A party wall surveyor if you are unsure whether your work is covered.
Source: Party walls and building work
The Party Wall etc Act 1996: explanatory booklet
The explanatory booklet describes notice periods of at least two months for work to an existing party wall, and at least one month for a new wall on the boundary line or excavation within 3 or 6 metres of a neighbour’s building (depending on depth). If a neighbour does not respond within 14 days, a dispute is generally treated as having arisen and surveyors are appointed.
Who confirms this: A party wall surveyor.
Planning permission, Building Regulations approval and Party Wall matters are separate. You may need any combination of them, and having one does not mean you have the others.
Source: Building regulations approval
Party walls and building work
What HBPD does not do: This app does not decide whether the Act applies to your work. A party wall surveyor can advise.
Stage 14 of 20 · Construction
Demolition where needed, excavation, foundations, drainage and the ground floor slab.
Likely relevant to this project
Demolition where needed, excavation, foundations, drainage and the ground floor slab.
Foundations inspected
In practice: Groundworks are where hidden conditions often show up. Be ready to make decisions quickly, but agree prices for changes before work continues. Typical practice
Unexpected ground or drainage conditions are among the most common causes of cost and time changes.
Often 2–6 weeks — project-dependent.
Often runs alongside: stages 13 (Site setup), 15 (Structure and shell).
Building Control usually inspects at key stages such as foundation excavations, drainage, damp-proof course, structural elements and completion. The exact stages and how much notice to give vary.
Who confirms this: Your Building Control body — ask for its inspection schedule at the start.
Source: The Building Regulations 2010, regulation 16 (notices and inspection of building work)
If a public sewer runs under or near the extension, the water company normally needs to be consulted, and a build-over agreement may be required. Drainage is covered by Approved Document H.
Who confirms this: Your water company and Building Control body.
In England, the local authority may require notice at particular stages of the work, but only for stages it intends to inspect based on its own assessment of risk. There is no single fixed list for every project. It can also require work that was covered up without the notice it needed to be opened up so it can be checked. An inspection is a check, not an approval of the whole project.
Who confirms this: Your building control body — ask for its inspection plan and notice periods before work starts.
Source: The Building Regulations 2010, regulation 16 (notices and inspection of building work)
Confirm with your building control body which stages it wants to inspect and how much notice it needs. It decides this based on the project, may ask for additional inspections, and an inspection is not an approval of the whole project.
Cross-section. On the left, a wall rises above ground level and continues below ground to a concrete foundation at the bottom of a trench in the soil. A damp-proof course runs across the wall a little above outside ground level. To the right of the wall is the ground floor, labelled as a build-up of slab, insulation and damp-proof membrane whose order depends on the design. Below the floor, a drain pipe on bedding slopes downwards from left to right to an inspection chamber, with an arrow showing the fall. Two triangle markers show possible building control inspection checks: the foundation excavation before concrete is poured, and the drain before it is covered.
marks a possible building control inspection check. Your building control body confirms which checks it needs.
What HBPD does not do: This app does not judge whether foundations or drainage are adequate.
Early access
The full app covers all 20 stages, tailored to your answers about your own home.
HBPD is in beta. We’re improving it based on homeowner feedback. Email us to request early access and, if you like, tell us what you found useful or where you would like more help.
No configured mail app? Write to [email protected] with the subject “HBPD early access request”. All details are optional. Please do not send home addresses, plans or sensitive documents. Access is provided only after individual approval. See our privacy information.
HBPD does not replace designers, engineers, builders or Building Control. Requirements depend on your property and work; the app does not guarantee costs, permission, compliance or outcomes. Confirm requirements with the relevant professionals and authorities.
The tailored pathway currently covers England. Official sources were last reviewed on 18 October 2026.